- GREENHOUSE ASSEMBLY Greenhouse (102.720 m²),
- corridor (3.835 m²), cantine (1.080 m²) = 107,635 m2
- Screen system
- CO2 installation
- Electrical, automation and computer installation
- Packing Hall/Technical Room (13.840 m²)
- Water installation
- Fog system
- Heating system
- Cooling pad corridor
